Hiring Cost Estimator

Calculate true cost of hiring. Include salary, benefits, taxes.

Published June 2024Updated June 2024
Calculator
Result
KES 278,600 to fill this role
Advertising and agencyKES 15,000
Time spent interviewingKES 12,600
Paid onboardingKES 11,000
Output lost while they come up to speedKES 240,000
Total cost to hireKES 278,600
Cost if they leave and you hire againKES 557,200

The ramp row assumes a new starter produces about half of a settled colleague’s output during the ramp period, which is a rule of thumb rather than a measurement. It is included because it is usually the largest line and the one nobody budgets. The final row is the number to weigh against whatever it would cost to keep the person you already have.

Automate this
Want Veira to do this for every sale, every shift, every branch, automatically?

Most of the cost is not the advert

Advertising is the line everyone budgets and usually the smallest one. The real cost is time: shortlisting, interviewing, inducting, and the weeks during which a new person produces less than the colleague they are learning from.

That ramp period is the largest line in most hires and the one nobody counts, which is why it is included here even though it is an estimate rather than a measurement.

What this is useful for deciding

The final row doubles the total, because a hire that does not work out means paying the whole cost twice within a year. Set that figure against what it would cost to keep the person you already have: a pay review, better hours, or fixing whatever is driving people out.

It is also the number to weigh against a contractor or an agency for short-term needs, where the hiring cost is avoided entirely.

Prefer this running automatically, on every sale, with no manual entry?

Sign Up

Worked examples

Filling a counter role: KES 15,000 advertised, 14 hours of interviewing
  • Interviewing: KES 12,600
  • Paid onboarding: KES 11,000
  • Output lost over an 8-week ramp: KES 240,000
  • Total KES 278,600, and KES 557,200 if the hire does not stay

Frequently asked questions

What does it cost to hire someone?
Far more than the advert. Shortlisting and interviewing time, paid onboarding, and the weeks during which the new person produces less than a settled colleague. That last line is usually the largest and the one nobody budgets.
Why does the calculation include lost output?
Because it is real money. A new starter producing about half of a settled colleague’s output for eight weeks costs the business that difference, whether or not it appears on an invoice. The fifty per cent figure is a rule of thumb, so adjust it to your own experience.
How long is a realistic ramp period?
A counter role might be a few weeks; a specialist or management role can be months. Use what you have actually seen rather than what the job description implies.
Is it cheaper to retain someone than replace them?
Almost always, which is what the final row is for. Set the cost of hiring twice against what a pay review, better hours or fixing the underlying problem would cost.
Should this change how I recruit?
It usually argues for spending more time on the hire and more on the first ninety days, since a hire that does not stay means paying the whole cost again. It also makes a contractor or an agency worth pricing for short-term needs.

Doing this by hand every time? Veira runs the same calculation automatically on every sale, no spreadsheet required.

Need help, or want to talk it through first? Chat with us on WhatsApp