A reorder point is the stock level at which you place your next order, and getting it wrong costs money in both directions. Set it too low and you sell out while the delivery is still on the road, which sends your customer to the shop next door and sometimes keeps them there. Set it too high and your cash is sitting on a shelf as stock instead of in your till. Most Kenyan shopkeepers set it by feel, which works until the supplier is late once. This is the arithmetic that replaces the feel, and you only need two numbers you already have.

Quick answer

Your reorder point is (how many you sell per day x how many days the supplier takes) + a buffer. Sell 12 sodas a day, supplier takes 4 days, keep 2 days spare: reorder at (12 x 4) + 24 = 72 crates-worth. Below that, order.

Key takeaways
  • Reorder point = (daily sales x supplier lead time) + a buffer. It is arithmetic, not instinct, and it is the same arithmetic for sodas and for spare parts.
  • Lead time means the day stock lands on your shelf, not the day you send the order. Orders placed on Friday for a Monday delivery are four days, not one.
  • The buffer covers the week the supplier is late or the week you sell double, so size it from how badly those two things actually go for you.
  • A reorder point you never look at is a number on paper. It earns its keep only when something checks stock against it without you remembering to.
On this page▾
  1. What a reorder point actually is
  2. Working out your reorder point
  3. Where this goes wrong
  4. A worked example: sodas in a Nakuru duka
  5. Doing this without counting by hand
  6. Frequently asked questions

What a reorder point actually is

A reorder point answers one question: at what stock level do I need to place the order so that the new stock arrives before the old stock runs out? It is not a target stock level and it is not a maximum. It is a trigger.

Two numbers decide it. The first is how fast you sell the item, per day, averaged over a normal period rather than over a festive week. The second is lead time, which is how many days pass between you placing the order and the goods being on your shelf and sellable. Lead time is not what the supplier promises; it is what the supplier does.

A third number is optional but almost always worth having: a buffer, usually called safety stock. It absorbs the two things the formula cannot predict, which are a week where you sell faster than normal and a delivery that arrives later than normal. Both happen. The buffer is what stops either from emptying your shelf.

Want to see it running in your own business first?

Sign Up

Working out your reorder point

Do this per item, or per group of items that move at a similar rate and come from the same supplier.

  1. 1

    Step 1: Find your real daily sales rate

    Take total units sold over a settled period and divide by the number of days. A month is better than a week because one slow Monday distorts a week. Use a normal month rather than December. If you sold 360 units in 30 days, your rate is 12 a day.

  2. 2

    Step 2: Measure lead time, do not assume it

    Count the days from when you sent the order to when the goods were on the shelf. Do this for the last three or four orders from that supplier and take the longest, not the average. A supplier who is usually three days and occasionally seven is a seven-day supplier for planning purposes, because the seven-day delivery is the one that empties your shelf.

  3. 3

    Step 3: Multiply

    Daily rate multiplied by lead time gives the stock you will sell while waiting. Twelve a day across four days is 48 units. That is the bare minimum you need on the shelf when you place the order, and it assumes nothing goes wrong.

  4. 4

    Step 4: Add a buffer

    Decide how many extra days of cover you want and multiply by the daily rate again. Two days at 12 a day is 24 units. For a fast-moving item you can afford a smaller buffer because you reorder often; for something that only one supplier in the county carries, make it bigger.

  5. 5

    Step 5: Write it on the stock card

    The number is useless in your head. Write it on the stock card, the shelf edge or the product record, so whoever is counting can act on it without asking you. A reorder point only works if the person who notices the level is the person who can place the order.

Where this goes wrong

Using the supplier’s promised lead time

The promise is a sales figure. Use your own records of when goods actually arrived. If you have not been recording that, start now: the date on the delivery note against the date on your order is enough.

Setting one reorder point for the whole shop

A crate of soda and a box of phone chargers do not move at the same rate and rarely come from the same supplier. One number across all of them will overstock the slow items and understock the fast ones, which is the worst of both.

Never revisiting it

A reorder point set in January is wrong by June if your sales have grown. Recheck the daily rate every quarter, and immediately after anything that changes footfall, such as a new competitor opening or a road being closed.

Treating the buffer as untouchable stock

Safety stock is there to be sold when something goes wrong. If it never moves, it is not a buffer, it is dead capital and the number is too high.

Forgetting the minimum order quantity

If the supplier only sells in cartons of 48 and your reorder point is 50, you will be ordering a carton every time you dip below. That is fine, but it means your real stock range is 50 to 98, and you should know that before you plan your cash.

A worked example: sodas in a Nakuru duka

Worked example

A shop sells 360 bottles of one soda brand in a 30-day month, so 12 a day. The distributor is nominally next-day but the last four deliveries took 3, 4, 3 and 6 days. Planning on 6 is the safe choice, because the six-day delivery is the one that matters.

Twelve a day across six days is 72 bottles sold while waiting. The owner adds two days of buffer, which is another 24, giving a reorder point of 96 bottles. When the shelf and store together drop to 96, the order goes in.

The distributor sells in crates of 24, so the order is placed in crates. Four crates, 96 bottles, brings stock back to roughly 192 at the moment of delivery, which is about 16 days of cover. If that feels like too much cash on a shelf, the answer is not to lower the reorder point, which only risks stockouts. It is to ask the distributor for a smaller, more frequent drop.

The number to watch afterwards is whether the shop ever actually hits zero. If it does, lead time or the rate is wrong. If the buffer never gets touched across a few months, it is too big and some of that cash can go back to work.

Business impact

Stock you cannot see is stock you lose: dead capital sitting on slow shelves, empty shelves on your fast movers, and shrinkage no one can explain.

Veira tracks every item in and out with reorder alerts, so you hold the right stock and losses surface early.

Free tools for this

Doing this without counting by hand

Veira records every sale as it happens, so the daily rate is a figure you read rather than one you reconstruct from memory at the end of the month. Set a low-stock level per product and the system flags the item when it drops through, on the phone you already carry.

Because the sales history sits alongside the stock level, the rate updates as your shop changes. A product that was selling 12 a day in March and is selling 20 a day in September shows that without anyone noticing it manually.

None of this removes the judgement in step 2. Lead time is a fact about your supplier, not about your software, and it is worth writing down after every delivery. What the system removes is the arithmetic and the remembering.

Frequently asked questions

What is the reorder point formula?
Reorder point = (average daily sales x lead time in days) + safety stock. If you sell 12 a day, the supplier takes 4 days and you want 2 days of buffer, that is (12 x 4) + 24 = 72 units.
How do I calculate safety stock?
The simplest method that works is to decide how many extra days of cover you want and multiply by your daily sales rate. Two days at 12 units a day is 24 units. Use a bigger buffer for items with one unreliable supplier and a smaller one for items you can restock locally the same day.
Should I use average or maximum lead time?
Use the longest recent lead time rather than the average. The average delivery does not empty your shelf; the late one does. If your last four orders took 3, 4, 3 and 6 days, plan on 6.
How often should I review my reorder points?
Every quarter as a routine, and immediately after anything that changes your sales rate: a new competitor, a price change, a road closure, or a season starting. A reorder point set against last year’s sales rate is just a guess with arithmetic attached.
Do I need a different reorder point for every product?
Per product is ideal, but per group is a workable start. Group items that sell at a similar rate and come from the same supplier, set one point for the group, then split out the handful of fast movers that justify their own number.
What if my supplier has a minimum order quantity?
Round up to the minimum and accept that your stock will swing between the reorder point and the reorder point plus one order. Know that range before you plan your cash, and if the swing ties up too much money, negotiate a smaller, more frequent delivery rather than lowering the trigger.
Does a reorder point work for perishable stock?
It works, but the buffer has to be smaller because the cost of holding extra is spoilage rather than just tied-up cash. For fresh items, many shops set the buffer at half a day and reorder daily instead of carrying cover.

A reorder point is two numbers and a multiplication, and it replaces the most common cause of a lost sale in a small shop: finding out you are out of something when a customer asks for it. Work it out once per fast-moving item, write it where the person counting can see it, and revisit it when your sales change. If you would rather the system watched the level for you, see how Veira handles stock.

Need help, or want to talk it through first? Chat with us on WhatsApp
Terms explained

Keep reading

See all Business guides

Veira for your business

On the Veira side of this: what Veira costs, by plan.

Browse Veira by business type · Who we serve